Truck Body Stand

Location
Goonyella Riverside Mine
Client
BHP Billiton Mitsubishi Alliance (BMA)

The project was to produce a stand that enabled the Maintenance Department to work on the underside of the truck body.

Wave’s responsibilities included all engineering, design, documentation, and project management.

The initial measurements of the truck body performed through Laser Measuring. The data collected in this stage of the project was then used to develop a model for the stand that would allow use on different truck bodies and at different positions to suit the work being carried out at the time.

The work carried out by Wave in conjunction with the client delivered a safe, reliable and compliant piece of maintenance equipment and resulted in improved OHS within the work place.