Tritton Plant Upgrade

Location
Nyngan
Client
Straits Resources

Design and shop detailing for upgrade of copper concentrator at the Tritton operation. 

Scope included the installation of additional flotation capacity and two tower mills to increase the grinding capacity (throughput) and product recovery for the operation.

Wave International’s ability to respond at short notice to the client’s requirements has enabled the project to be commenced and progressed with minimal delays allowing the additional capacity to be realised in the shortest possible time frame for the client.